Skip to content
Installation guides
Controller installation

Axon Shock — Ultra Bee

About 30–45 minutes · 6 stages · 31 steps

Do Not Rush

Allow yourself a good amount of time. Rushing causes pinched wires and incorrect fitment — both time-consuming to diagnose.

Correct Tools

A good set of allen / hex keys is essential. We will not accept responsibility for products or bolts damaged by incorrect tooling.

Safety First

You are installing an upgrade to an electric motorcycle. If you lack the experience, please seek a professional. Motorcycles can be dangerous when incorrectly installed.

Tools you need

  • Hex keys: 6, 5, 4, 3 and 2.5 mm
  • 10 mm spanner
  • 10 mm socket (for the phase wire and battery lead bolts)
  • Flat screwdriver
  • OptionalZip ties

Harness map

Main harness (1)–(8), encoder extension lead (9)–(10) and display harness (11)–(13).

Main harness

  • (1) (2) To the bike harness
  • (3) (4) To the controller's two round leads
  • (5) To the brake throttle
  • (6) To the display harness, plug (11)
  • (7) (8) CAN bus link: connect to each other

Encoder extension lead

  • (9) To the controller's encoder lead
  • (10) To the motor encoder

Display harness

  • (11) To the main harness, plug (6)
  • (12) 12 V supply, to the bike harness
  • (13) To the Axon display (blue plug)

Stages

Go to stage 1